Replacement slab at industrial unit.

Uncategorized

Replacement slab at industrial unit.

slab replacement

Existing yard slab had failed causing an uneven surface for the forklifts.

The slab was broken out and replaced over 2 days. RC50 XF fast setting concrete was used so the slab could be trafficked the next day limiting the time that the yard was out of action. Please get in touch using our contact form if you require our services and John or Dave will be in touch – Contact Quality Groundworkers in Leeds | Carthy Contracting