A late order halfway through the summer holidays, but we managed to get this access ramp completed at Ryecroft Academy in Bradford before the children returned to school.
Flag on edge retainer with concrete finish to the ramp. Key clamp handrails bolted down to the concrete (these would normally be root fixed and welded, but the very tight timescale made this unrealistic). Lots of tarmac make up to surrounding ground.