
This car park had been badly neglected, the main turning area had worn through to the stone and was badly rutted out.
We planed out the central area and re-based it ready for overlay. Missing edgings were added, sunken kerbs lifted and a broken manhole cover replaced.
The entire car park was then resurfaced with a heavy duty SMA surface course using our midi paver.
Thermo line marking to the parking bays and footpath completed the job, leaving a very badly deteriorated car park looking like new.
More finished pictures below, with before pictures at the bottom:


Before pictures:


Planed out ready for re-basing:
